MultiMedia Products, Speakers, Earphones, Headsets
Base Price ₹370.34 + ₹66.66 GST (18%)
₹437.00
Speaker EVM EnDesk Plus Gaming 2.0 Computer Speaker EVM-BTS-208 | 3W × 23 Power /RMS, Multi Color LED Lights, Volume Controller, Aux & USB 3.5mm Output, 110cm Cable Length, Black
- Brand :EVM
- Product SKU :EVM-BTS-208
- Category :MultiMedia Products, Speakers, Earphones, Headsets
-
Availability :
8 In Stock
Base Price ₹370.34 + ₹66.66 GST (18%)
₹437.00
₹1,749.00
(incl. GST)
- Model NameSpeaker EVM EnDesk Plus Gaming 2.0 Computer Speaker EVM-BTS-208 | 3W × 23 Power /RMS, Multi Color LED Lights, Volume Controller, Aux & USB 3.5mm Output, 110cm Cable Length, Black
- BrandEVM
- CategoryMultiMedia Products, Speakers, Earphones, Headsets
- AvailabilityIn Stock
● Power supply: USB 5V 2
● Power RMS: 3W × 2 3
● Speaker: 2 inches × 2 4
● Signal to noise ratio SUR: ≥ 85dB 6
● Frequency response FR: 100Hz-20KHz 6
● Input sensitivity: 500 mV 7
● Color: Black 8>Distortion: ≤ 5% 10>Impedance Impedance: 4 Ω 11
● Interface: USB head φ 3.5 Stereo input 12
● Function: Line controlled tuning, RGB Product size: 74 * 83 * 125mm
● Cable length: 1.1m, Cable control volume
You may also like these
Zebronics
Base Price ₹423.73 + ₹76.27 GST (18%)
₹500.00
37 In Stock
Earphone Zebronics Zeb-Escape 10 | Wireless Neckband Bluetooth Headset, Built-In rechargeable battery, Voice assistant support, Call function, 20hrs Playback Time, 1.5hrs Charging Time, Volume / media control, Grey
Base Price ₹423.73 + ₹76.27 GST (18%)
₹500.00
₹1,199.00
(incl. GST)
Logitech
Base Price ₹720.34 + ₹129.66 GST (18%)
₹850.00
2 In Stock
Headset Logitech H110 Wired | Stereo Headphone | Noise Cancelling Mic | 3.5mm Dual Audio Jack | PC/Mac/Laptop, Grey
Base Price ₹720.34 + ₹129.66 GST (18%)
₹850.00
₹1,095.00
(incl. GST)
EVM
Base Price ₹677.97 + ₹122.03 GST (18%)
₹800.00
20 In Stock
EVM EnLumina Bluetooth Speaker EVM-BTS-201 | 12W RMS Output | Bluetooth 5.3 | RGB Lights | 2000mAh Battery | USB & AUX Connectivity | Portable Wireless Speaker
Base Price ₹677.97 + ₹122.03 GST (18%)
₹800.00
₹2,799.00
(incl. GST)
Logitech
Base Price ₹5,593.22 + ₹1,006.78 GST (18%)
₹6,600.00
1 In Stock
Headphone Logitech Zone Vibe 300 | Wireless Bluetooth Over Ear Headset With Noise Cancelling Microphone, Compatible with Windows, Mac, Chrome, Linux, iOS, iPados, Android - Graphite
Base Price ₹5,593.22 + ₹1,006.78 GST (18%)
₹6,600.00
₹8,390.00
(incl. GST)
Zebion
Base Price ₹254.24 + ₹45.76 GST (18%)
₹300.00
8 In Stock
Headphone Zebion HP-750 Over Ear Headphone with Rotatable Boom MIC, 2-Jack Connector with Volume Control, with 1.8-2.5M Cable Length, 80mW Max Output, Sturdy & Comfortable, Suitable for Devices with AUX Input | Colour:- Black
Base Price ₹254.24 + ₹45.76 GST (18%)
₹300.00
₹520.00
(incl. GST)
Logitech
Base Price ₹1,144.07 + ₹205.93 GST (18%)
₹1,350.00
4 In Stock
Headset Logitech H151 single pin | Noise-Cancelling mic, 3.5 mm Analog Stereo, PC / Mac / Laptop - Black
Base Price ₹1,144.07 + ₹205.93 GST (18%)
₹1,350.00
₹1,594.99
(incl. GST)
Zoook
Base Price ₹911.02 + ₹163.98 GST (18%)
₹1,075.00
1 In Stock
Speaker Zoook Rocker Boombox Atom | Bluetooth Speaker / Designed for Great FM / 10 Watts / TWS / USB / TF / AUX / Rechargeable Battery / Thumping bass / Portable / Wireless / Dual Drivers / handsfree Calling (Black)
Base Price ₹911.02 + ₹163.98 GST (18%)
₹1,075.00
₹2,499.00
(incl. GST)
Logitech
Base Price ₹677.97 + ₹122.03 GST (18%)
₹800.00
3 In Stock



