Sunny Enterprises
99706 36571

WhatsApp Us 24/7

All Categories
MultiMedia Products, Speakers, Earphones, Headsets

Headphone EVM EnSonic EVM-WHF-01 | Wireless Blutooth Headphone With Mic, 40 Hours Playtime, Dual Connectivity, Bluetooth 5.3 + EDR, 400mAh Rechargeable Battery, Type-C Interface, Aux Cable Interface, Raised Buttons, 40mm Speaker Driver, Grey

  • Brand :EVM
  • Product SKU :EVM-WHF-01 (GREY)
  • Category :MultiMedia Products, Speakers, Earphones, Headsets
  • Availability : 11 In Stock

Base Price ₹650.00 + ₹117.00 GST (18%) ₹767.00 ₹3,999.00 (incl. GST)

  • Specification
  • Description
  • Model NameHeadphone EVM EnSonic EVM-WHF-01 | Wireless Blutooth Headphone With Mic, 40 Hours Playtime, Dual Connectivity, Bluetooth 5.3 + EDR, 400mAh Rechargeable Battery, Type-C Interface, Aux Cable Interface, Raised Buttons, 40mm Speaker Driver, Grey
  • BrandEVM
  • CategoryMultiMedia Products, Speakers, Earphones, Headsets
  • AvailabilityIn Stock

40 Hours Playtime – Non-stop entertainment

400mAh Battery – Long-lasting and rechargeable

In-Built Mic – Clear calling experience

Type-C Charging & AUX Support – Dual convenience

Bluetooth 5.3 + EDR – Fast, stable connection

Dual Connectivity – Use Wired or Wireless

Raised Buttons – Easy fingertip control

40mm Speaker Driver – Deep, powerful sound

You may also like these

Fast & Reliable Delivery
100% Customer Satisfaction
Wholesale & Retail Pricing
Top IT & Electronics Brands
24/7 Support for Clients