Adapters & Charges for Smartphones, Laptops, Routers, DVRs
Base Price βΉ2,415.25 + βΉ434.75 GST (18%)
βΉ2,850.00
Hub EVM 7-in-1 Smartphone Desktop Expansion With Hub EMH-01 | USB-C Hub for Android Smartphones, SD/Micro Card Readers, HDMI 4K, USB-A 5Gbps, PD 60W Vivid Desktop
USB-C Hub for Android Smartphones, SD/Micro Card Readers
- Brand :EVM
- Product SKU :EMH-01
- Category :Adapters & Charges for Smartphones, Laptops, Routers, DVRs
-
Availability :
2 In Stock
Base Price βΉ2,415.25 + βΉ434.75 GST (18%)
βΉ2,850.00
βΉ4,999.00
(incl. GST)
- Model NameHub EVM 7-in-1 Smartphone Desktop Expansion With Hub EMH-01 | USB-C Hub for Android Smartphones, SD/Micro Card Readers, HDMI 4K, USB-A 5Gbps, PD 60W Vivid Desktop
- BrandEVM
- CategoryAdapters & Charges for Smartphones, Laptops, Routers, DVRs
- AvailabilityIn Stock
1) 1 X Type C male cable: Cable length 110mm
2) 1 X HDMI port: Max resolution: support up to 4K@30Hz (To project the mobile screen on the monitor screen)
3) 1 X USB 3.0 port: Maximum power output up to 5V/900mAh Data transfer speeds up to 5Gbps
4) 2 X USB 2.0 port: Maximum power output up to 5V/500mAh Data transfer speeds up to 480Mbps
5) 1 X SD card reader: Support up to 1TB
6) 1 X micro SD card reader: Support up to 1TB
7) 1 X Type C female port: PD 3.0 Passthrough charging
8) Dimensions: 103 X 77 X 28MM
9) Compatibility: Huawei Mate10 and newer, SAMSUNG S8 and newer, Macbook Pro 2016 and newer, Macbook Air 2018 and newer
You may also like these
RANZ
Base Price βΉ254.24 + βΉ45.76 GST (18%)
βΉ300.00
6 In Stock
Power Adapter Ranz 19V 1.7AMP 32W LCD | Pin Size: 6.5mm x 4.4mm(Power Cord Not Included)
Base Price βΉ254.24 + βΉ45.76 GST (18%)
βΉ300.00
βΉ999.00
(incl. GST)
RANZ
Base Price βΉ296.61 + βΉ53.39 GST (18%)
βΉ350.00
8 In Stock
Power Adapter Ranz 14V 1.43AMP 20W LCD / LED | Pin Size: 6.5mm x 4.4mm (Power Cord Not Included)
Base Price βΉ296.61 + βΉ53.39 GST (18%)
βΉ350.00
βΉ999.00
(incl. GST)
ARTIS
Base Price βΉ466.10 + βΉ83.90 GST (18%)
βΉ550.00
14 In Stock
Adapter Artis AR0501 65Watt Laptop Charger without Power Cord, Compatible with Dell Laptops, 19.5V / 3.34A, Pin Size: 7.4mm x 5.0mm (BIS Certified)
Base Price βΉ466.10 + βΉ83.90 GST (18%)
βΉ550.00
βΉ1,399.00
(incl. GST)
ARTIS
Base Price βΉ450.00 + βΉ81.00 GST (18%)
βΉ531.00
2 In Stock
Adapter Artis A0402 | 45Watt Laptop Charger Without Power Cord, Compatible With Dell Laptops, 19.5V/ 2.31A, Pin Size:4.5 x 3.0 mm, (BIS Certified), Black
Base Price βΉ450.00 + βΉ81.00 GST (18%)
βΉ531.00
βΉ1,399.00
(incl. GST)
Zebronics
Base Price βΉ381.36 + βΉ68.64 GST (18%)
βΉ450.00
4 In Stock
Adapter Zebronics 65W ZEB-LA745018565H | Compatible with laptops
Base Price βΉ381.36 + βΉ68.64 GST (18%)
βΉ450.00
βΉ1,425.00
(incl. GST)
SONY
Base Price βΉ550.85 + βΉ99.15 GST (18%)
βΉ650.00
7 In Stock
Power Adapter Sony 19.5V 3.9AMP AC Adapter | Output Voltage 19.5 Volts, Input Voltage 240 Volts (Power Cord Not Included) Black
Base Price βΉ550.85 + βΉ99.15 GST (18%)
βΉ650.00
βΉ1,999.00
(incl. GST)
TP-Link
Base Price βΉ600.00 + βΉ108.00 GST (18%)
βΉ708.00
7 In Stock
Adapter TP-Link UB500 Plus | Long Range Bluetooth USB Adapter, Reliable Bluetooth 5.3, Wireless Connectivity, Adjustable, Multi-Directional Antenna
Base Price βΉ600.00 + βΉ108.00 GST (18%)
βΉ708.00
βΉ1,099.00
(incl. GST)
Secureye
Base Price βΉ296.61 + βΉ53.39 GST (18%)
βΉ350.00
6 In Stock







