Sunny Enterprises
99706 36571

WhatsApp Us 24/7

All Categories
Components for Assembling PC (Cpu, Motherboard, Ram, Cabinet, Keyboard, Mouse, NUC)

Mouse EVM Wired Optical EVM-M009 | USB Optical Mouse with 1000 DPI Resolution, 2.6MM Wire Length, Plug and Play, Black+Grey

EVM M009 is a wired optical mouse designed for smooth cursor control and reliable everyday computing. It features a 1000 DPI optical sensor, USB connectivity, a 1.1-metre cable and an anti-slip scroll wheel. Ideal for desktops, laptops, office work, education and home use.

  • Brand :EVM
  • Product SKU :EVM-M009
  • Category :Components for Assembling PC (Cpu, Motherboard, Ram, Cabinet, Keyboard, Mouse, NUC)
  • Availability : 300 In Stock

Base Price ₹127.12 + ₹22.88 GST (18%) ₹150.00 ₹299.00 (incl. GST)

  • Specification
  • Description
  • Model NameMouse EVM Wired Optical EVM-M009 | USB Optical Mouse with 1000 DPI Resolution, 2.6MM Wire Length, Plug and Play, Black+Grey
  • BrandEVM
  • CategoryComponents for Assembling PC (Cpu, Motherboard, Ram, Cabinet, Keyboard, Mouse, NUC)
  • AvailabilityIn Stock

The EVM M009 Wired Optical Mouse is a practical and reliable input device for everyday computing. Its 1000 DPI optical sensor delivers smooth and accurate cursor tracking for office applications, internet browsing, educational activities and routine computer tasks.

Featuring a USB 2.0 interface and plug-and-play connectivity, the mouse is easy to install without additional drivers. The 1.1-metre cable offers convenient connectivity for desktop and laptop setups, while the compact body and lightweight construction make it suitable for everyday use.

Finished in black and grey, the EVM M009 combines essential functionality with a simple, professional appearance. It is an ideal accessory for offices, schools, homes and business workstations.

Key features

  1. 1000 DPI optical sensor for precise cursor movement
  2. USB 2.0 wired connectivity
  3. 1.1-metre cable for convenient desktop connectivity
  4. Anti-slip scroll wheel for comfortable scrolling
  5. Plug-and-play installation
  6. Lightweight, compact design
  7. Black and grey colour combination
  8. 1-year manufacturer warranty

Technical specifications

SpecificationDetails
BrandEVM
Model numberEVM-M009
Product typeWired Optical Mouse
Sensor resolution1000 DPI
ConnectivityWired USB
USB interfaceUSB 2.0
Cable length1.1 metres
Number of buttons3
Scroll wheelAnti-slip scroll wheel
ColourBlack + Grey
MaterialHIPS plastic
Dimensions (L × W × H)111 × 61.7 × 35.4 mm
Net weight85 g
CompatibilityWindows, macOS, Linux
Power sourceUSB port
Warranty1 Year


You may also like these

Fast & Reliable Delivery
100% Customer Satisfaction
Wholesale & Retail Pricing
Top IT & Electronics Brands
24/7 Support for Clients