Components for Assembling PC (Cpu, Motherboard, Ram, Cabinet, Keyboard, Mouse, NUC)
Base Price ₹440.68 + ₹79.32 GST (18%)
₹520.00
Keyboard EVM EnHype EVM-WDK-612 Wired Gaming Keyboard | 62 Keys, USB Interface, LED Rainbow Backlit, 1.5m Cable Length, Smooth Keystrokes, Mobile Stand, Plug & Play, Black
Keyboard EVM EnHype EVM-WDK-612 Wired Gaming Keyboard
- Brand :EVM
- Product SKU :EVM-WDK-612
- Category :Components for Assembling PC (Cpu, Motherboard, Ram, Cabinet, Keyboard, Mouse, NUC)
-
Availability :
10 In Stock
Base Price ₹440.68 + ₹79.32 GST (18%)
₹520.00
₹1,999.00
(incl. GST)
- Model NameKeyboard EVM EnHype EVM-WDK-612 Wired Gaming Keyboard | 62 Keys, USB Interface, LED Rainbow Backlit, 1.5m Cable Length, Smooth Keystrokes, Mobile Stand, Plug & Play, Black
- BrandEVM
- CategoryComponents for Assembling PC (Cpu, Motherboard, Ram, Cabinet, Keyboard, Mouse, NUC)
- AvailabilityIn Stock
● 62 Keys Gaming Keyboard
● Interface: USB, Plug and play
● Backlighting: Led Rainbow backlit
● FN+W to switch direction key FN+ light to switch breathing function,
● 19 anti-ghosting key
● Mobile Stand
● Smooth Keystrokes
● USB Interface
You may also like these
Zoook
Base Price ₹400.00 + ₹72.00 GST (18%)
₹472.00
3 In Stock
Mouse Zoook Blade Wireless ZK-BLADE-RG | Rechargeable 7 Colour mice/ RGB Breathing Lights/ 3 DPI Levels/ Auto Shut Down/ Silent Click Technology/ 600 Mah Battery/ Light Weight/ Plug and Play (Rose Gold)
Base Price ₹400.00 + ₹72.00 GST (18%)
₹472.00
₹1,995.00
(incl. GST)
EVM
Base Price ₹190.68 + ₹34.32 GST (18%)
₹225.00
23 In Stock
Mouse EVM Wireless EVO - 3W042 | 2.4GHz Optical Mouse with 4D Scroll, USB Receiver, 1600 DPI Resolution, 10m Working Range, Plug & Play, Grey
Base Price ₹190.68 + ₹34.32 GST (18%)
₹225.00
₹548.99
(incl. GST)
Zebion
Base Price ₹600.00 + ₹108.00 GST (18%)
₹708.00
10 In Stock
Cooling Pad Zebion ZEFER Z5 | Laptop Cooling Pad with Mobile Stand, Dual Fan, Dual USB Port, Blue LED Lighting, Stand to Hold PC from Slipping, Customizable Height in Multiple Positions
Base Price ₹600.00 + ₹108.00 GST (18%)
₹708.00
₹1,199.00
(incl. GST)
EVM
Base Price ₹525.42 + ₹94.58 GST (18%)
₹620.00
61 In Stock
Keyboard & Mouse Combo EVM Gaming Wired EnHawk WDKM-315 | 104 Keys, Backlight Keyboard, 1.5meter Cable Length, White
Base Price ₹525.42 + ₹94.58 GST (18%)
₹620.00
₹2,499.00
(incl. GST)
EVM
Base Price ₹130.51 + ₹23.49 GST (18%)
₹154.00
37 In Stock
Mouse EVM Wired Gaming Razer MG-622 | USB Mouse With LED BackLight, Up to 1500 DPI, Unique Design
Base Price ₹130.51 + ₹23.49 GST (18%)
₹154.00
₹449.00
(incl. GST)
EVM
Base Price ₹381.36 + ₹68.64 GST (18%)
₹450.00
12 In Stock
Mouse EVM Wired Gaming 8D M06087 | 6400 DPI Resolution, Multi Color LED, USB Output, 1.5m Braided Cable, Rubber Coat Scroll Wheel, Black
Base Price ₹381.36 + ₹68.64 GST (18%)
₹450.00
₹1,299.00
(incl. GST)
EVM
Base Price ₹1,250.00 + ₹225.00 GST (18%)
₹1,475.00
9 In Stock
Cabinet EVM Enigma 126 | Micro ATX Computer Case With Inbuilt SMPS 500W, Heavy Steel Metal Body, Black
Base Price ₹1,250.00 + ₹225.00 GST (18%)
₹1,475.00
₹3,499.00
(incl. GST)
EVM
Base Price ₹423.73 + ₹76.27 GST (18%)
₹500.00
9 In Stock



