Keyboard, Mouse, Combos (Wired, Wireless & Bluetooth)
Base Price ₹635.59 + ₹114.41 GST (18%)
₹750.00
Keyboard EVM EnAir WLK-009 Rechargeable Wireless Keyboard With Touchpad | Bluetooth 5.0 With Type C Interface, 10 Million Clicks, Smooth Keystrokes, Support Windows, MacOS, Android, Linux, Chrome OS, Slim & Lightweight, Black
Keyboard EVM EnAir WLK-009 Rechargeable Wireless Keyboard With Touchpad
- Brand :EVM
- Product SKU :ENAIR WLK-009 (BLACK)
- Category :Keyboard, Mouse, Combos (Wired, Wireless & Bluetooth)
-
Availability :
1 In Stock
Base Price ₹635.59 + ₹114.41 GST (18%)
₹750.00
₹2,999.01
(incl. GST)
- Model NameKeyboard EVM EnAir WLK-009 Rechargeable Wireless Keyboard With Touchpad | Bluetooth 5.0 With Type C Interface, 10 Million Clicks, Smooth Keystrokes, Support Windows, MacOS, Android, Linux, Chrome OS, Slim & Lightweight, Black
- BrandEVM
- CategoryKeyboard, Mouse, Combos (Wired, Wireless & Bluetooth)
- AvailabilityIn Stock
● Bluetooth Version 5.0
● Type-C Interface
● Power Source: 180mAh Lithium re-chargeable Battery
● No. of keys: 78 Key
● Switch Life: 10 million keystrokes
● System Requirements:>OS Support: Windows I macOS I Android I Linux I Chrome OS
● Battery Life: Up to 30 days
● Charging Time : 2 hours approx.
● Effective Range : Up to 10 meters
You may also like these
Logitech
Base Price ₹2,203.39 + ₹396.61 GST (18%)
₹2,600.00
3 In Stock
Keyboard Logitech Wireless K380 | Multi-Device Bluetooth Keyboard for Windows, Apple iOS, Apple TV, Android or Chrome, for PC / Mac / Laptop / Smartphone / Tablet (Rose)
Base Price ₹2,203.39 + ₹396.61 GST (18%)
₹2,600.00
₹3,195.00
(incl. GST)
Logitech
Base Price ₹296.61 + ₹53.39 GST (18%)
₹350.00
9 In Stock
Mouse Logitech M90 Wired USB Mouse | 1000 DPI Optical Tracking, Ambidextrous PC / Mac / Laptop | Black
Base Price ₹296.61 + ₹53.39 GST (18%)
₹350.00
₹530.00
(incl. GST)
Logitech
Base Price ₹1,440.68 + ₹259.32 GST (18%)
₹1,700.00
12 In Stock
Keyboard & Mouse Logitech Nano Wireless Combo MK240, 12 Function Keys 2.4Ghz Wireless Black & YellowLogitech MK240 Nano Wireless USB Keyboard and Mouse Set, 12 Function Keys 2.4GHz Wireless, 1000DPI, Spill-Resistant Design, PC/Mac, Black/Chartreuse Yellow
Base Price ₹1,440.68 + ₹259.32 GST (18%)
₹1,700.00
₹2,095.00
(incl. GST)
HAMMOK
Base Price ₹300.00 + ₹54.00 GST (18%)
₹354.00
14 In Stock
Keyboard Hammok Guts Mini USB Small Computer Wired Keyboard | Slim Compact External Keyboard For Laptop, Tablet, Windows, PC, Computer, Ultra Thin Design, Black
Base Price ₹300.00 + ₹54.00 GST (18%)
₹354.00
₹599.00
(incl. GST)
Logitech
Base Price ₹2,203.39 + ₹396.61 GST (18%)
₹2,600.00
4 In Stock
Keyboard Logitech Wireless K380 | Multi-Device Bluetooth Keyboard for Windows, Apple iOS, Apple TV, Android or Chrome, for PC / Mac / Laptop / Smartphone / Tablet (Blue)
Base Price ₹2,203.39 + ₹396.61 GST (18%)
₹2,600.00
₹3,195.00
(incl. GST)
Logitech
Base Price ₹550.85 + ₹99.15 GST (18%)
₹650.00
74 In Stock
Mouse Logitech M170 Wireless, 2.4 GHz with USB Nano Receiver, Optical Tracking, 12-Months Battery Life, Ambidextrous, PC / Mac / Laptop - Black
Base Price ₹550.85 + ₹99.15 GST (18%)
₹650.00
₹1,074.00
(incl. GST)
Logitech
Base Price ₹677.97 + ₹122.03 GST (18%)
₹800.00
16 In Stock
Mouse Logitech M220 Silent Wireless Mouse | 2.4 GHz with USB Mini Receiver, 1000 DPI Optical Tracking, 18 Month Battery Life, Ambidextrous PC/ Mac/ Laptop, Charcoal Black
Base Price ₹677.97 + ₹122.03 GST (18%)
₹800.00
₹1,295.00
(incl. GST)
Logitech
Base Price ₹805.08 + ₹144.91 GST (18%)
₹949.99
47 In Stock



