External Harddisk
Base Price ₹20,338.98 + ₹3,661.02 GST (18%)
₹24,000.00
Harddisk EVM Elite EnSave Pro 2TB External SSD EPSSDPro/2T | Smallest Portable SSD With 2000 Mb/s Read & 1700 Write Speed, USB 3.2 Gen 2x2 Type-C Interface, Multiple Device compatibility, Black
Smallest Portable SSD With 2000 Mb/s Read & 1700 Write Speed, USB 3.2 Gen 2x2 Type-C Interface
- Brand :EVM
- Product SKU :EPSSDPRO/2T
- Category :External Harddisk
-
Availability :
3 In Stock
Base Price ₹20,338.98 + ₹3,661.02 GST (18%)
₹24,000.00
₹25,999.00
(incl. GST)
- Model NameHarddisk EVM Elite EnSave Pro 2TB External SSD EPSSDPro/2T | Smallest Portable SSD With 2000 Mb/s Read & 1700 Write Speed, USB 3.2 Gen 2x2 Type-C Interface, Multiple Device compatibility, Black
- BrandEVM
- CategoryExternal Harddisk
- AvailabilityIn Stock
• Aluminium Alloy Body for Faster Heat Dissipation.• Extremely Compact Profile: 65 x 31 x 5.7 mm• High Read & Write speeds: R Upto 2000 MB/s, W Upto 1700 MB/s (based onhost drive support USB-C 3.2 Gen2x2) Seller reserves the right of interpretation.• USB 3.2 Gen 2x2 Type-C Interface.• Multiple Device compatibility.• C to C & C to USB-A adaptor Included.
You may also like these
Seagate
Base Price ₹18,150.00 + ₹3,267.00 GST (18%)
₹21,417.00
1 In Stock
Harddisk Seagate One Touch 5TB STKZ5000402 | External HDD With Password Protection, For Windows & Mac, With 3 Yr Data Recovery Services, Light Blue
Base Price ₹18,150.00 + ₹3,267.00 GST (18%)
₹21,417.00
₹36,998.99
(incl. GST)
WD
Base Price ₹9,915.25 + ₹1,784.75 GST (18%)
₹11,700.00
8 In Stock
WD My Passport 2TB Portable External Hard Disk Drive | USB 3.2 Gen 1 | Black | WDBYVG0020BBK-WESN
Base Price ₹9,915.25 + ₹1,784.75 GST (18%)
₹11,700.00
₹16,990.01
(incl. GST)
Seagate
Base Price ₹11,950.00 + ₹2,151.00 GST (18%)
₹14,101.00
3 In Stock
Harddisk Seagate One Touch 2TB External HDD with Password Protection - Black, for Windows and Mac, with 3 yr Data Recovery Services, and 4 Months Adobe CC Photography (STKY2000400)
Base Price ₹11,950.00 + ₹2,151.00 GST (18%)
₹14,101.00
₹23,999.01
(incl. GST)
Seagate
Base Price ₹48,050.85 + ₹8,649.15 GST (18%)
₹56,700.00
1 In Stock
Harddisk Seagate Expansion 16TB STKP16000400 Desktop 3.5" External Drive | USB 3.0 For Windows & Mac with 3 yr Data Recovery Services, Black
Base Price ₹48,050.85 + ₹8,649.15 GST (18%)
₹56,700.00
₹80,999.00
(incl. GST)
EVM
Base Price ₹11,016.95 + ₹1,983.05 GST (18%)
₹13,000.00
4 In Stock
Harddisk EVM EnSave 1TB External SSD EPSSD/1T | Smallest Portable SSD With 550 Mb/s Read & 500 Mb/s Write Speed, USB 3.1 Gen 2 Type C, Compatible with All PCs & Laptops With USB Port, Black
Base Price ₹11,016.95 + ₹1,983.05 GST (18%)
₹13,000.00
₹17,999.00
(incl. GST)
Seagate
Base Price ₹15,500.00 + ₹2,790.00 GST (18%)
₹18,290.00
1 In Stock
Harddisk Seagate One Touch 4TB External HDD with Password Protection, Space Gray, for Windows and Mac, with 3 yr Data Recovery Services, and 4 Months Adobe CC Photography (STKZ4000404)
Base Price ₹15,500.00 + ₹2,790.00 GST (18%)
₹18,290.00
₹31,999.00
(incl. GST)
WD
Base Price ₹7,966.10 + ₹1,433.90 GST (18%)
₹9,400.00
10 In Stock
WD My Passport 1TB Portable External Hard Disk Drive, USB 3.2 Gen 1, Black, 256-bit AES Hardware Encryption, Password Protection, Automatic Backup – WDBYVG0010BBK
Base Price ₹7,966.10 + ₹1,433.90 GST (18%)
₹9,400.00
₹13,600.00
(incl. GST)
SanDisk
1 In Stock




