Cords, Charging cables, hdmi, Vga, usb cables etc
Base Price βΉ296.61 + βΉ53.39 GST (18%)
βΉ350.00
Charger EVM Enpower EVM-PD-011 | 22.5W PD Charger, White
EnPower PD Charger
- Brand :EVM
- Product SKU :EVM-PD-011
- Category :Cords, Charging cables, hdmi, Vga, usb cables etc
-
Availability :
3 In Stock
Base Price βΉ296.61 + βΉ53.39 GST (18%)
βΉ350.00
βΉ1,699.00
(incl. GST)
- Model NameCharger EVM Enpower EVM-PD-011 | 22.5W PD Charger, White
- BrandEVM
- CategoryCords, Charging cables, hdmi, Vga, usb cables etc
- AvailabilityIn Stock
(1) Input : AC100-240V~50/60 Hz 0.5A
(2) PD Output : DC 5V 3A, 9V 2.5A, 12V 1.87A
(3) Charging Port: Single Type-C
(4) Over Current Protection
(5) Short Circuit Protection
(6) Surge Protection
(7) No load Protection
You may also like these
RANZ
Base Price βΉ100.00 + βΉ18.00 GST (18%)
βΉ118.00
20 In Stock
Cable Ranz 3 RCA to 3 RCA 1.5mtrs
Base Price βΉ100.00 + βΉ18.00 GST (18%)
βΉ118.00
βΉ210.00
DIER
Base Price βΉ200.00 + βΉ36.00 GST (18%)
βΉ236.00
72 In Stock
Cable Dier Berlin USB 2.0 Extension 5M, Gold Plated Connectors | Usb Male-A to Female-A Cord, Fully Compatible with all USB B Port Scanner or Printer, 1 Year Warranty, Black
Base Price βΉ200.00 + βΉ36.00 GST (18%)
βΉ236.00
βΉ799.00
(incl. GST)
Belkin
Base Price βΉ466.10 + βΉ83.90 GST (18%)
βΉ550.00
5 In Stock
Cable Belkin Type C To Usb-A 2.0 Tough Unbreakable Braided Nylon Cable 3.3 Feet (1 Meter) Black, Usb-If Certified, Supports Fast Charging For Tablet
Base Price βΉ466.10 + βΉ83.90 GST (18%)
βΉ550.00
βΉ749.01
(incl. GST)
HAMMOK
Base Price βΉ84.75 + βΉ15.25 GST (18%)
βΉ100.00
149 In Stock
Cable Hammok Harmony USB 2.0 Printer Cable 1.5Mtr | USB Type A To USB Type B Cable, Black
Base Price βΉ84.75 + βΉ15.25 GST (18%)
βΉ100.00
βΉ399.01
(incl. GST)
DIER
Base Price βΉ300.00 + βΉ54.00 GST (18%)
βΉ354.00
6 In Stock
Cable Dier LEROY DP To HDMI Converter Cable 1.8mtr | 1080p 4K Ultra HD, Gold-Plated Connectors, Compatible With Computer, Laptop, HDTV, Projector, Monitor, Black
Base Price βΉ300.00 + βΉ54.00 GST (18%)
βΉ354.00
βΉ999.00
(incl. GST)
EVM
Base Price βΉ169.49 + βΉ30.51 GST (18%)
βΉ200.00
8 In Stock
Charger EVM Dual USB with Type C Cable EVM-CH-04 | For Android Smartphone, 5V Fast Charger, 2.4A Output
Base Price βΉ169.49 + βΉ30.51 GST (18%)
βΉ200.00
βΉ649.00
(incl. GST)
Haze
Base Price βΉ250.00 + βΉ45.00 GST (18%)
βΉ295.00
4 In Stock
Patch Cable Haze Cat6 20mtr | LAN Wire High Speed Internet Cable, Compatible with Laptop, PC, Router, Modem
Base Price βΉ250.00 + βΉ45.00 GST (18%)
βΉ295.00
βΉ450.00
(incl. GST)
DIER
Base Price βΉ211.86 + βΉ38.13 GST (18%)
βΉ249.99
11 In Stock




